Jack Young+8615957976085
+86-571-85368892 bd@geotextile.cc
Categories
Contact Us

Add: No.36 Fengyi Road, Yuyao County, Ningbo City, Zhejiang, China

Mob: +8615957976085

Tel: +86-571-85368892

Email: bd@geotextile.cc

News
Home > News > Content
Technical Requirements For Geotextile Laying
Dec 19, 2018

1, the basic inspection: Check whether the base is flat, solid, if there are foreign bodies, should not be handled properly.

2, Test shop: According to the situation of the scene, determine the size of geotextile, after cutting to test the shop, cutting size should be accurate.

3, check whether the width of the Sarah is appropriate, the connection should be flat, tight moderate.

4, positioning: With a hot air gun will be two geotextile bonding parts, the spacing of the adhesive contact should be appropriate.

5, the splice site stitching should be straight, the pins should be uniform.

6, after stitching should check whether the geotextile is laid flat, whether there are defects. 7, if there is a non-demand phenomenon, should be timely repair.